Nature of pilot project


A Meeting-related Information Exchange Facility (Part #10)


[Parts: First | Prev | Next | Last | All] [Links: To-K | From-K | From-Kx | Refs ]


It seems fairly clear, in the light of similar data processing exercises, that such a system is feasible at least from the point of view of software and hardware. The more important issue is whether it is worth doing at this time, and whether doing it would not create more problems for the founder-members than they would care to handle. This raises the question as to whether a pilot project could clarify whether the project was feasible for given the limited scope of any such experiment it might operate below the critical number of users necessary to make it viable, both economically and in terms of information flow (An hotel reservation system cannot be satisfactorily proven with three users ). The other danger is that such a pilot project might be too simple in conception, so that although the participants could engage in some "data swopping", the significance of the participation of other categories of users, and the facilities that they require, would not be recognized. It is too easy to meet immediate priorities, ignoring future requirements, and thus building obsolescence and irrelevance into the system.

From the above it can be concluded that it is not necessary to prove the technical feasibility. The administrative/accounting/ working/control relationships can perhaps be best sorted out in discussion. Insights emerging from such discussions should be reflected in a detailed specification of the software required if not already available.

Some of the problems can be brought out in simulations of the operation of such a system as a special exercise on an existing computer conferencing system since such software already has most of the features required, including the possibility of relatively sophisticated messaging, editing, retrieval, questionnaire dissemination, etc.

Perhaps the key question is how such a project would affect the operations and finances of the founder-members. Clearly experimenting with such a system, in parallel with existing operations, with each data element costing considerably more than normal, could be very discouraging. On the other hand many of the potential foundermembers are already using, or are about to use, in-house computer equipment. The question is then whether the pilot project could have "fail-safe" elements built into it. In other words, even if they decided (after the experiment) not to collaborate, such bodies could then anyway build on their experience and software and proceed to compete in a more sophisticated manner,


[Parts: First | Prev | Next | Last | All] [Links: To-K | From-K | From-Kx | Refs ]

Subjects: Nature